Coffee Trailer Electrical Planning: What to Know Before You Buy Equipment
The espresso machine is not the problem. Everything running at once is.
Read →Ask what size generator a coffee trailer needs and you will get a number. The number is usually wrong, because it was produced by adding up what the equipment draws while running , and that is not what a generator has to survive.
Two things break that arithmetic. Startup draw: motors and compressors pull far more current in the moment they switch on than they use afterwards, so a refrigerator that runs at a modest load can spike several times that when the compressor kicks in. And simultaneous demand: the question is never what one appliance uses, it is what happens when the espresso machine is heating, the air conditioning is running, the fridge compressor starts and somebody switches on the grinder, all inside the same second.
Your quiet Tuesday will not find the problem. The peak lands on a hot Saturday with a queue, when the air conditioning never cycles off, the machine is recovering constantly and the refrigeration is working hardest. That is the minute the generator has to hold, and it is the minute a trailer sized on running watts trips.
Sizing is four questions, in order:
That last figure is what you size to, with headroom above it. A generator running at its absolute ceiling all day is a generator with a short life.
A fully equipped coffee trailer is typically built around a 50-amp service at 120/240 volts. A single-group espresso machine tends to sit around 20 amps and a two-group around 30, before anything else is switched on. Those two figures alone explain why coffee trailers surprise people: the machine can account for half the service before you add cooling, refrigeration and hot water.
Operators running a full setup off a generator are generally looking in the region of 12 to 15 kW rather than the portable units sold for job sites. Treat that as the neighbourhood, not as your answer. Your equipment list, your climate and how you work move it in both directions, and a number taken off a page instead of off your own load is how people end up buying twice.
Do the load arithmetic first, with the real data plates of the real equipment you intend to buy. The generator, the shore power connection and the layout around both all depend on that one number, and it is the number most people skip.
The electrical planning page covers why simultaneous demand behaves the way it does, and what goes in a coffee trailer covers the list you will be adding up.
Only need this part? Trailer & Equipment is $97 on its own.

The espresso machine is not the problem. Everything running at once is.
Read →
A complete build runs $58,000 to $75,000. Equipment is what moves it, and here is why.
Read →
The problems that hold up a mobile food unit are mostly settled at the design stage, and they are far cheaper to fix there.
Read →
Most mobile bars never sell a drink. Here is when a license is actually required, and how dry hire works.
Read →
From the trailer to insurance to permits, plus the hidden costs nobody budgets for.
Read →
Decide how the business needs to operate first. Then choose a trailer that can support it.
Read →
The equipment you need depends on the business you are trying to operate, not on somebody else's list.
Read →
Two identical prices can represent completely different businesses. Your pricing needs to start with yours.
Read →
A floor plan can look beautiful on a computer and still be terrible to work in.
Read →
A location with lots of people is not automatically a good coffee location.
Read →
The trailer is the last decision, not the first.
Read →
The waste tank is bigger than the fresh tank, and that surprises people.
Read →
A dry hire bar and a full service bar are not the same vehicle.
Read →
The certificate is not paperwork. It is whether you can take the booking.
Read →
Generic templates ask a coffee trailer the wrong questions.
Read →
A mobile bar has bookings, not daily revenue. That changes the plan.
Read →